How long should it take to install a 50 foot exterior gas line? | | One day | 74% | | Two days | 7% | | Three days | 7% | | Not sure | 11% | | | | | Question: How long should it take to install a 50 foot exterior gas line? Top Answer (74% of 27 votes): One day.
Answer: Two days Explanation: This includes trenching or excavation, running and securing the gas line, performing pressure tests, backfilling, and ensuring the installation meets all safety and code requirements. | | Rough-In Plumbing Solutions, LLC | Answer: One day Explanation: It normally take 4-6 hours but depending on soil and weather conditions it could take up to a day. | | Kooline Plumbing Heating & Air | Answer: One day Explanation: Up to 50 feet we would be able to complete this job in one day. The ditch would have to stay open until the completion of the inspection by the city before the ditch can be covered. Keep in mind that the entire gas system must be brought up to code of the gas company shuts off service to the home. This includes vent piping, drip legs on fixtures, hard pipe coming out of the furnance. | | SDL Plumbing Inc. | | | ProMatcher | Answer: One day Explanation: Professional Workmanship | | Peace of Mind Plumbing LLC | Answer: One day Explanation: Digging, inspection | | Guaranteed Plumbing | Answer: One day Explanation: It should take less then a day long as there is nothing in way. | | JD all service plumbing | | | ProMatcher | Answer: One day Explanation: To install a new black iron gas line or copper gas line buried in the yard takes one days . For the digging and the installation of the line. | | All City Construction | Answer: One day Explanation: Can use galvanized and flex | | Reeves Plumbing | Answer: One day Explanation: One day for excavation of a trench instalation of the gas line, the inspection and trench fill in. | | East Coast Home Inspections LLC | | | ProMatcher |
|